Ivy

Last Friday night, I found myself alone in my living room with all the other inhabitants of my house fast asleep. IronBro and Walrus were visiting for the weekend, and Ironman and IronBro were preparing for a big race the next morning. I decided, in a sudden bizarre fit of neatnik-ness to clean out the WIP cupboard, aka our massive corner cabinet that houses the TV and piles and piles of my crap, I mean knitting.

And I found a whole bunch of stuff that I had forgotten about, including my two thirds finished Ivy. I started this sweater back in January, when I was about eight months pregnant with Boo, feeling approximately the size of a New England barn, and basically just tired of being an incubator. It was going to be the sweater that I wore this winter when I finally got my body back from being pregnant. I managed to get through one sleeve (which started off as a gauge swatch), the back, and was 10 rows away from being done with both fronts when I just stopped. Put it down, waddled away, and moved on to other projects. I don't remember why, but I suspect it had something to do with the arrival of Tin Tin and the loss of any spare moments or energy for the next few months.

Anyway, Friday night I was digging away in the back of the Cupboard o' Doom, and I pulled out a large bag containing some really pretty dark red yarn. And four pieces of a sweater. I pulled out the pieces and spread them out on the floor to see what I thought.

Ivy back and fronts



Ivy sleeve

And my thoughts were pretty positive: I love the color, the twisted stitches show up pretty well, and, most importantly, I think it's going to fit well. This is the part I wasn't really able to pin down when I started the thing - how do you know what size to make when you've got a massive hormonally-induced rack, plus the baby bump and a good 30 extra pounds? You guess, that's what you do, and this time I think I managed to guess right. So instead of trying to burn my way through a Mr. Greenjeans in time for Christmas, I think I'll take this with me and finish it off when the List is done.

Note I said "when", not "if". Unfortunately, there's no good reason for that optimism.

No Fiber Friday

No fiber this Friday, but I had a sudden realization yesterday when I went to pick Boo up from daycare.

I have given birth to Tintin.

Picture 026

Picture 025

Hairdo courtesy of a snot-induced There's Something About Mary moment.

A Tintin who has grown almost three inches in three months, eats everything she can get her stinkin' paws on, and was standing up in her crib at daycare crowing yesterday when I walked in the room.

We are so in trouble.

Wow, you're really fast.

This is what the nice lady sitting next to me on the bus this morning said to me, upon realizing that the project I was working on was not the project I was working on yesterday. Clearly the poor thing is under the impression that I must finish one project before starting another. Poor deluded soul. Yesterday I was wending my way through the interminable size 11.5 socks (thanks for having such freakin' enormous feet Dad!) (Or, as they would say in Boston, wicked big feet), today I was working on the beginnings of Part I of II planned. My only defense is panic. Pure, unadulterated panic. OK, plus some Brad-Pitt-as-Achilles distraction on TMC (boy was that a bad, bad movie).

A brief update on the List:

1. One sweater for a small child - I'm sorry Boo, but you may be wearing your sister's handmedowns this Christmas
2. Bayerische socks - hmmmm...a brief looksee on Ravelry indicates that these take people, on average, 73 months to finish. Perhaps I'd better rethink.
3. Plain stockinette socks - maybe 3 inches left on #2!
4. Zeebee - done except for grafting OK, this thing has been done except for the grafting for two months now. I'm not even sure I know where it is, other then somewhere in the depths of the WIP bin (otherwise known as the TV corner cabinet in the living room)
5. Everlasting bagstopper x 2 - not started Part I started
6. Two sets of Fair Isle alpaca mitts - need to be designed and knitted. Still. We'll see...
7. Endpaper mitts - technically, I've now knit almost two of them, but only one is giftable.

We're at T=-21 days and counting, but technically they all need to be done before we leave for Boston on the 21st. So really only 17 days. Oh shit.

PS - I now know which democratic candidate I'm going to vote for. (link from the Yarn Harlot)

Ms. Tomato Head and Ms. Apple Head

My sister-in-law (also a knitter!) recently sent the girls some hats in preparation for our trip north for the holidays. So I present to you Ms. Tomato Head and Ms. Apple Head.


Pictures 004

Pictures 006

Devil wanted to be absolutely sure that she had the Apple hat, being not a fan of tomatoes (unless they've been converted to ketchup of course). It's finally been cold enough down here to actually need hats, and they are absolutely adorable. Thank you so much B!

Recycling

The yarn I'm using for the Endpaper Mitts is reclaimed from two sweaters I picked up for cheap at Goodwill. I've now found another source for recycled yarn: previously knit sweaters.

Mountain Mohair cardi

This is my Mountain Mohair sweater - Moriah's Wildflower Cardigan. It's a beautiful sweater, and I wear it whenever it's cold enough (which is not as often as I would like). The yarn is beautiful soft and slightly fuzzy, and it's held up pretty well over the last 5 years or so. But on my way home yesterday, I looked down and noticed this:

Mountain Mohair cardi

Since the yarn is basically a softly spun single, not a plied yarn, it's not terribly strong. I must have caught the edging on something and it broke the yarn. Now, in and of itself, this is not enough of a reason to frog the sweater. But I've been thinking about knitting something else from this for a while. First of all, there's no shaping to the sweater. It's straight up and down and basically just hangs there when I'm wearing it. And it doesn't do a lot for my body honestly - I'm not exactly svelte, and I think that it would look better on me with a bit more shaping.

I also am not a fan of the seed stitch bands - they are a bit loose and floppy, and don't feel substantial enough. I've decided to frog the sweater and use the yarn for something else. Initially, I was thinking about a top down V neck with set in slightly belled sleeves. But after last night's Mr. Redjeans fiasco (finished ribbing, bound off, tried on and realized that A) clearly the designer did not have my figure in mind when she had us switch to size 7 needles for the ribbing*, but I really don't need to display that much of my tummy, B) it was going to be too short in any event, and C) clearly in my mind I am still in my pre-pregnancy, half-Ironman body, not my post-two kids-still-lactating body - I'm going to have to go up a size), I'm thinking that I may soon be working on Mr. Bluejeans, while Mr. Redjeans gets to wear a set of concrete galoshes.

* this is nicer then saying she was smoking crack because really, the ribbing was going to pull in anyway with the cables. Why have it pull in more with smaller needles?