Ivy
And I found a whole bunch of stuff that I had forgotten about, including my two thirds finished Ivy. I started this sweater back in January, when I was about eight months pregnant with Boo, feeling approximately the size of a New England barn, and basically just tired of being an incubator. It was going to be the sweater that I wore this winter when I finally got my body back from being pregnant. I managed to get through one sleeve (which started off as a gauge swatch), the back, and was 10 rows away from being done with both fronts when I just stopped. Put it down, waddled away, and moved on to other projects. I don't remember why, but I suspect it had something to do with the arrival of Tin Tin and the loss of any spare moments or energy for the next few months.
Anyway, Friday night I was digging away in the back of the Cupboard o' Doom, and I pulled out a large bag containing some really pretty dark red yarn. And four pieces of a sweater. I pulled out the pieces and spread them out on the floor to see what I thought.
And my thoughts were pretty positive: I love the color, the twisted stitches show up pretty well, and, most importantly, I think it's going to fit well. This is the part I wasn't really able to pin down when I started the thing - how do you know what size to make when you've got a massive hormonally-induced rack, plus the baby bump and a good 30 extra pounds? You guess, that's what you do, and this time I think I managed to guess right. So instead of trying to burn my way through a Mr. Greenjeans in time for Christmas, I think I'll take this with me and finish it off when the List is done.
Note I said "when", not "if". Unfortunately, there's no good reason for that optimism.





