It's December 23rd, and my Christmas knitting is (almost) done

Behold. One pair of (unfelted, unsewn - that's todays project) Felted Clogs.

Christmas present the last 2009

This brings the list to:

Person A - done
Person B - done
Person C - done
Person D - done
Person E - done
Person F - done
Person G - done
Person H - done
Person I - still not done, but this one isn't due in the States until mid-January, so I've still got some breathing room there.

Now the only people left to knit for are my poor neglected daughters' heads. The Nemo hat is on the ribbing finally.

Nemo hat in progress

This is the last time I knit a hat for anyone in fingering weight yarn...

I can manage to do it, I've also got this lovely stuff for a hat for Devil.

Kacha

It's pink, so the chances she'll actually wear it seem pretty decent.

How's your Christmas knitting going?

Fiber Friday: Cheating

Soooooo...I know I said I wasn't going to do any spinning until I was done with the Christmas knitting, and I wasn't, but my windfall at Stash last week got the better of me. Once I'd finished the next-to-last Christmas present, I broke down and started in on this:

Ashland bay merino top?

I've changed my mind about the composition of this top. There may still be merino in there, but I think there's also some silk - there are white bits scattered throughout that tend to not draft the same as the other fibers. Maybe it's tencel - it's clumping in a manner similar to Air - but in any case, the singles are turning out beautifully.

Singles

Slightly tweedy, with turquoise and royal blue and yellow and green and white. I'm spinning this on automatic - worsted inchworm draft, singles ~24 wpi. Brainless default spinning. There will be enough time for purposeful spinning next month...

And just to show that I'm not slacking on the last present issue:

Last Christmas present

One skein of Green Mountain Spinnery Double Twist, and some recycled red yarn left over from my Gathered Pullover. In progress, and halfway up the foot. Thank goodness these things are fast!

Windfall

Last Friday, I was early to pick up Devil, so I stopped in to Stash to say hi to Ali. When I walked in the door, she looked at me, pointed to a large blue bag sitting on a chair, and said "Free fiber". That was all I needed. I walked out ten minutes later with this:

Stash stash

That's about 2 lbs of assorted fibers, most of them things I've never spun before. Diane was clearing out her stash, and had dropped off a bag full for anyone to take. I ended up with:

Ashland bay merino top?

Some lovely soft multicolored top, maybe Ashland Bay?

SIlk hankies

A pile of silk hankies dyed in green, teal and pink.

Lamb's wool/blue fox

60% Lamb's wool, 40% blue fox (!). Given our regular nocturnal visitor, this may have to become something for Ironman.

Merino/possum blend

A merino/possum (!) blend.

Spindlefrog sampler

The remnants of a Spindlefrog sampler. As far as I can tell, this contains some silk, some mohair, and some wooly stuff that might be cashmere or camel or angora or alpaca.

Wool/silk batts

Last but not least, a bagful of wool/silk batts in green and blue and white.

I know this is getting boring...

But since all I've been doing is working on projects that I can't actually show you, I can only update the list as items are finished and checked off. Sorry!

Not surprisingly, things have changed again...

Person A - mittens from my birthday present from my MIL (and no, it's not her). There are not started, nor is yarn chosen. Move along here, there's nothing to see I've gone back to the original gift for said person, which is finished. Check number one.
Person B - cowl and maybe a hat from same yarn. Cowl done, hat, not so much cowl is still done, but in keeping with the rest of the Christmas knitting this year, I think the hat will now become mitts.
Person C - hat or some manly fingerless mitts. He could carry off fingerless mitts that are alas, not started finished! Blocked even. Check number two.
Person D - ?????? Fuck. Alpaca scarf. Done. Numero tres crossed off the list.
Person E - handspun mittens. One finished, one started but I had to spin some more yarn. And knit on tiny needles. Hmmmm...this is the TV knitting except that I am out of yarn and haven't soaked/thwacked the newest yarn, plied last night. Sigh. Finished, put check number 4 on the list.
Person F - hat and matching mittens. Done! Blocked even. Hooray! Check number five.
Person G - felted clogs. Not started. I've got yarn somewheres though. Might could go and dig it out while my new handspun is drying tonight... Still not started, nor have I gone stash diving for yarn.
Person H - Albatross. Which is done but not blocked. Blocked, but still pinned out on the guest bed. Which needs to be freed up by Monday when the first set of overseas guests arrives. Check number six.
Person I - mittens, which are done, but there's another project to go out with them in the mail that won't be done for a while Mittens have been repurposed for someone else, but the socks are almost half done.

So if I can count accurately (one can only hope) that means I have only two presents that haven't been cast on and one that is halfway done. That's actually pretty good, although I forgot to include Boo's hat on this list, but it's about halfway done too. I must needs cast on for one of the two remaining items tonight, but the situation is not too dire. At least not yet...but you never know when an emergency might strike!

And I promise, as soon as I'm able to pull my act together enough during the (too few) daylight hours, I'll take some teaser shots of everything that is done so far and actually put some pictures in one of these posts.